The building was to be 4 to 5 floor structures with various levels and plan areas to be used for different purposes with varing loading patterns. The areas on which the machines were to be erected were completed before. So that the commissioning activities could jump start and that helped in reducing the completion time of the project. The primary framing was in MS wide flange beams and columns with a 9.0 m grid in both directions. The secondary grid was modified to suit the requirements of the usage of the particular floor.